Mission Control

Launches

Track upcoming Garuda missions, past test milestones, and real-time mission status.

Next Mission

Garuda 7 — Sudarshan Engine Qualification

Garuda 7 — Sudarshan Sea-Level Engine

upcoming
00
DAYS
00
HRS
00
MIN
00
SEC
Date
December 15, 2025
Payload
Engine Qualification
Orbit
Ground Test
Status
upcoming

Upcoming Missions3

upcomingDec 15, 2025 • 10:00 NPT

Garuda 7 — Sudarshan Engine Qualification

#garuda7-sf-01

Full-duration Sudarshan sea-level engine hot-fire qualification burn. Validating propulsion performance, chamber pressure, and thermal management for Garuda 7 flight certification.

Vehicle
Garuda 7 — Sudarshan Sea-Level Engine
Payload
Engine Qualification
Mass
N/A
Orbit
Ground Test
Altitude
N/A
Customer
Mach24 Orbitals (Internal)
upcomingJun 20, 2026

Garuda SR — Suborbital Demo

#garudasr-sd-01

First Garuda SR suborbital flight. Demonstrating hybrid propulsion, avionics, guidance, and recovery systems. First-ever rocket launch from Nepal.

Vehicle
Garuda SR (Sounding Rocket)
Payload
Technology Demonstrator
Mass
50 kg
Orbit
Suborbital
Altitude
~120 km
Customer
Mach24 Orbitals (Internal)
upcomingDec 1, 2026

Garuda 7 — Orbital Demo

#garuda7-od-01

First Garuda 7 orbital flight. Full two-stage mission with Sudarshan engines (sea-level + vacuum) and Kickstage OTV for precision orbital insertion and payload deployment.

Vehicle
Garuda 7 (Two Stage + Kickstage)
Payload
Orbital Pathfinder
Mass
200 kg
Orbit
LEO
Altitude
400 km
Customer
Mach24 Orbitals (Internal)

Past Milestones3

successAug 10, 2025 • 14:30 NPT

Sudarshan Engine Hot Fire Test 03

#sudarshan-ht-03

Third successful hot-fire test of the Sudarshan hybrid engine. Achieved target chamber pressure and burn duration of 15 seconds.

Vehicle
Sudarshan Sea-Level Engine (Ground)
Payload
Engine Test
Mass
N/A
Orbit
Ground Test
Altitude
N/A
Customer
Mach24 Orbitals (Internal)
successMay 22, 2025 • 11:00 NPT

Sudarshan Engine Hot Fire Test 02

#sudarshan-ht-02

Second hot-fire test validating Sudarshan throttle control and propellant feed system performance.

Vehicle
Sudarshan Sea-Level Engine (Ground)
Payload
Engine Test
Mass
N/A
Orbit
Ground Test
Altitude
N/A
Customer
Mach24 Orbitals (Internal)
successFeb 14, 2025 • 10:00 NPT

Sudarshan Engine Hot Fire Test 01

#sudarshan-ht-01

First-ever hot-fire test of the Sudarshan hybrid propulsion engine. Successful ignition and 5-second burn at Mach24's test facility.

Vehicle
Sudarshan Sea-Level Engine (Ground)
Payload
Engine Test
Mass
N/A
Orbit
Ground Test
Altitude
N/A
Customer
Mach24 Orbitals (Internal)
3
Engine Tests Completed
3
Upcoming Missions
100%
Test Success Rate
2027
Commercial Ops Target

Book Your Mission

Dedicated LEO missions from ~$1.5M. Rideshare from $300K. Contact us for a mission assessment.